I Project Personnel:
GENERAL |
UNIT |
RATE |
Management of Customer’s Labor | HR | $23.21 |
Day Labor Unskilled | HR | $87.41 |
Day Labor Foreman | HR | $135.45 |
Remediation Technician | HR | $171.23 |
Remediation Supervisor | HR | $186.47 |
Drying Technician | HR | $171.23 |
Drying Supervisor | HR | $186.47 |
Contents/Inventory/ Restoration Tech | HR | $91.78 |
Contents/Inventory/ Restoration Supervisor | HR | $111.42 |
Mover | HR | $87.41 |
Mover Supervisor | HR | $107.36 |
Electrician-Journeyman (Temp Services) | HR | $196.42 |
Carpenter | HR | $171.46 |
Carpenter Supervisor | HR | $191.44 |
Equipment Operator | HR | $128.22 |
Driver w/CDL | HR | $87.41 |
Hazmat/Asbestos Technician | HR | $89.20 |
Hazmat/Asbestos Lead Technician | HR | $89.20 |
Hazmat/Asbestos Supervisor | HR | $98.30 |
MANAGEMENT |
UNIT |
RATE |
Administrative Assistant (Data Input) | HR | $68.25 |
Controller | HR | $96.45 |
Job Cost Auditor | HR | $78.75 |
Sr. Job Cost Auditor | HR | $91.23 |
Estimator | HR | $135.45 |
Consultant | HR | $123.11 |
Senior Consultant | HR | $167.98 |
Inventory Manager (PDN Inventory) | HR | $67.54 |
Equipment Manager | HR | $87.41 |
Health and Safety Officer | HR | $103.45 |
Assistant Project Manager | HR | $102.89 |
Project Manager | HR | $134.00 |
Senior Project Manager | HR | $183.75 |
Project Coordinator | HR | $182.89 |
Decon Engineer | HR | $172.73 |
Decon Project Manager | HR | $152.25 |
Labor Provisions:
Standard Rate/Hour: |
The standard Rate is the hourly rate for work performed during a standard workday, per the included Labor Classification. Standard workday is defined as Monday – Friday 7:00 AM – 3:30 PM. All rates are for “open-shop” rates. Any Government Imposed rates, prevailing wage, union wage, or rates subject to collective bargaining will be negotiated based on the rate schedule for that area. |
Shift Work: |
Shift work is generally negotiated (Per Project) and can be defined on the actual agreement at the time of execution to align to the “8 hour rule”. |
Premium Rate/Hour: |
The premium rate/hour billable as Overtime shall be billed at the rate of one and one-half (1.5) times the standard rate per hour for work performed by each person that works in excess of eight hours per day, or, for work performed other than during standard work week as defined as Monday – Friday. Weekends, starting on Saturday and ending on Sunday will be billed at (1.5) times the scheduled hourly rate, or, as dictated by local governing authority. |
National Observed Holidays: |
Any work performed on a holiday shall be billed at a factor of Two (2.0) times the standard rate/hour or as dictated by a local governing authority. |
Stand – By: |
When circumstances beyond our control require personnel and or equipment to be delayed from beginning work, the standard rate/hour will be charged per person or per piece of equipment, based on actual time recorded per the daily “Crew Activity Sheet”. All applicable Labor associated fees will be applied. |
Small Tools and Miscellaneous Supplies: |
Labor charges for Direct Supervisors and other labor classes will include a 3.1% surcharge to account for small tools and miscellaneous supplies used on the project, such as hammers, chisels, shovels, brooms, pry bars, dust pans, sledge hammers, pump sprayers, garden hoses, rakes, scrappers, flashlights, screw drivers, wrenches, socket sets, hole saws, chalk lines, tape measures, utility knives, keyhole saw, saw horses, and fish tapes. |
Travel Time: |
Billable travel time will be billed on the “Port to Port Basis” (i.e. Office to Job site/ Job Site to Office). Travel will be billed at the applicable labor rate per the labor classification. |
Sewer Damage/Confined Space: |
Restoration/Mitigation relating to sewer damage/confined space will be billed at two (2.0) times the scheduled rate at each labor class listed above. This includes decontamination services for cleaning equipment used during the mitigation/restoration services. Holidays will be billed at two and one-half (2.5) times the scheduled rate for each labor class listed above. |
Per Diem: |
RENU Contracting Restoration will bill for Per Diem (for out of Town workers)at the published U. S. General Services Administration (GSA) rates per geographic area, per person, per day for each day personnel work on the project. |
Regional Modifier: |
When working in and around Metro Areas including but not limited to; San Francisco, Washington D.C., New York City (Inc. all Boroughs) Alaska, and Hawaii, a 25% premium will be applied to all Labor rates in order to account for increased costs associated with the local economy. This premium is the minimum and is subject to change. Any modification to the multiplier will be submitted in writing and will become part of this agreement. |
Unscheduled Equipment Rates: |
During the course of work, the company may find it necessary to purchase equipment not scheduled under the “Daily Rate.” In those situations, the Daily Rate shall be an acceptable industry daily rate rental rate. |
Ordered Equipment: |
Any Equipment ordered by the client shall be billed at a minimum of One Day Rental, plus, any related charges such as, but not limited to; labor, freight, taxes, and permits. This charge is applicable whether equipment is used or not on the Project. |
Generators: |
There will be a minimum charge of (1) daily rate plus ALL costs incurred if power is restored upon arrival or Client cancels generator order. It is also understood that Renu Contracting Restoration makes no guarantees on timelines for arrival during catastrophic event or any other circumstances beyond Renu Contracting Restoration’s control. |
Equipment, Materials & Consumables
PRODUCT |
UOI |
PRICE |
Axial 1 HP Air Mover | DY | $31.38 |
Wall Drying System (90 LF) | DY | $87.63 |
Forced Air Injection Kit | DY | $86.63 |
LGR Large – Phoenix 200 or (equal) | DY | $129.50 |
Air Scrubber/Negative Air (Large) | DY | $130.42 |
Dehumidifier 750-1199 CFM | DY | $490.12 |
Dehumidifier 1200-1999 CFM | DY | $605.21 |
Dehumidifier 2000-3249 CFM | DY | $795.91 |
Dehumidifier 3250-4999 CFM | DY | $1,198.75 |
Dehumidifier 5000-6999 CFM | DY | $1,477.50 |
Dehumidifier 7000-9999 CFM | DY | $1,797.53 |
Dehumidifier 10000-14999 CFM | DY | $2,382.98 |
Dehumidifier 15000-19999 CFM | DY | $3,049.29 |
Dehumidifier 20000 CFM | DY | $3,613.03 |
AC Unit 10 TON | DY | $702.91 |
AC Unit 25 TON | DY | $850.87 |
DX Unit – 5000 CFM | DY | $735.54 |
DX Unit – 10000 CFM | DY | $1,049.24 |
Heater, 300k BTU Indirect Diesel 2/25′ Duct | DY | $178.85 |
Water Extraction Unit- Portable | DY | $134.99 |
Water Extractor – portable (truck/trailer mount) | DY | $482.03 |
Pump, trash w/2″ hose | DY | $121.86 |
Pump, trash w/4″ hose | DY | $181.25 |
Flex Duct – 25′ Section (12″ – 36″) | DY | $18.84 |
Containment Barrels | DY | $2.58 |
Building Deodorizing – Hydroxyl (or Equal) | DY | $0.13 |
Cryo Blaster (80hp) w/ 220 CFM Compressor | DY | $805.10 |
Thermal Fogger – Commercial | DY | $95.18 |
Thermal Fogger – Electric | DY | $40.98 |
ULV Fogger | DY | $40.98 |
Vapor Tech Machine | DY | $43.73 |
Hydoxyl Machine XL3 | DY | $193.69 |
Auxiliary 150 Gallon Fuel Cell | DY | $49.08 |
Auxiliary 550 Gallon Fuel Cell | DY | $187.32 |
Auxiliary 1000 Gallon Fuel Cell | DY | $299.66 |
Generator Service/oil change (Weekly) | EA | $307.64 |
Equipment Decontamination – Small | EA | $25.23 |
Equipment Decontamination – Large | EA | $39.73 |
Fuel will be charged at market rates for all equipment, plus 19.75% | EA | |
Radio | DY | $20.48 |
Electronics Pkg. (comp/cell/air card/camera) | DY | $30.63 |
Job Vehicle | DY | $70.30 |
1/2 Ton Truck | DY | $82.94 |
3/4 Ton Truck | DY | $108.99 |
1 Ton Truck | DY | $137.91 |
1 1/2 Ton Truck | DY | $154.03 |
Tractor | DY | $180.45 |
Box Van | DY | $138.25 |
26′ Box Truck | DY | $158.91 |
Motorhome/Mobil Command Unit | DY | $318.09 |
Enclosed Equipment Trailers, greater than 10 GVW | DY | $147.78 |
Refrigerated Trailer | DY | $147.78 |
Container Box | DY | $59.38 |
Construction Trailer | DY | $98.76 |
Air Compressor – Electric | DY | $36.98 |
Dolly/Wheelbarrow | DY | $8.18 |
Tilt/Demo Cart | DY | $33.25 |
Mop Buckets (w/wringer) | DY | $6.49 |
Baker Scaffold (Per 6′ section) | DY | $33.25 |
Lift Electric SL 20 (or equal) | DY | $178.85 |
Lift Electric SL 30 (or equal) | DY | $229.95 |
Lift Boom SL 31-40 (or equal) | DY | $293.23 |
Lift Boom SL 41-50 (or equal) | DY | $351.15 |
Lift Diesel Scissor 31.-40 (or Equal) | DY | $369.39 |
Skid Steer-Bobcat (or equal) | DY | $729.12 |
Tractor 4 WD w/Front Loader | DY | $302.53 |
All Terrain Fork Lift 8,000 lb | DY | $598.85 |
Insulation Removal Machine | DY | $73.29 |
Airless Sprayer | DY | $158.87 |
Temp Lighting (String, Demo, Stand) | DY | $25.15 |
Temp Lights, Tower, mobile (400 WT Diesel) | DY | $129.97 |
Floor Maintainer – Walk Behind | DY | $207.38 |
Floor Buffer | DY | $76.95 |
Ladder – StepFall Protection | DY | $9.89 |
Ladder – Extension | DY | $13.15 |
Instant Shelter | DY | $19.05 |
Personal Fall Protection | DY | $34.84 |
100 Amp Distribution Panel | DY | $129.22 |
200 Amp Distribution Panel | DY | $193.25 |
400 Amp Distribution Panel | DY | $214.71 |
Extension Cord #10-#14 | DY | $4.18 |
3-way Pigtails | DY | $2.49 |
Generator Cables 4/0 (25′ Section) | DY | $35.18 |
6/4 SO Cable (25′ Section) | DY | $25.15 |
Spider Box | DY | $63.00 |
Spider Cable 2/5 -25 (25′ Section) | DY | $26.57 |
Electrical Cord Ramp – 36″ | DY | $11.71 |
350 KW Generator (triple shift) | DY | $1,837.16 |
230 KW Generator (triple shift) | DY | $1,259.70 |
175 KW Generator (triple shift) | DY | $996.75 |
150 KW Generator (triple shift) | DY | $949.80 |
125 KW Generator (triple shift) | DY | $836.18 |
100 KW Generator (triple shift) | DY | $766.01 |
80 KW Generator (triple shift) | DY | $631.82 |
70 KW Generator (triple shift) | DY | $552.94 |
60 KW Generator (triple shift) | DY | $473.95 |
40 KW Generator (triple shift) | DY | $434.46 |
35 KW Generator (triple shift) | DY | $390.05 |
20 KW Generator (triple shift) | DY | $296.18 |
5 KW Generator (triple shift) | DY | $196.50 |
Hepa Vacuum | DY | $83.58 |
HEPA Barrel Vacuum w/multiple Hoses | DY | $67.38 |
Upright Vacuum | DY | $25.34 |
Reciprocating Saw (Sawzall) | DY | $15.85 |
Circular Saw | DY | $15.85 |
Chain Saw | DY | $41.14 |
4 1/2″ Angle Grinder | DY | $12.68 |
Hammer Drill | DY | $15.82 |
Drill Corded | DY | $11.88 |
Drill Cordless | DY | $11.07 |
Nail Gun | DY | $19.79 |
Remediation Saw (Kett) | DY | $30.31 |
Pressure Washer (3500 PSI) | DY | $94.99 |
Pressure Washer – Hot | DY | $134.49 |
ULV Fogger | DY | $33.48 |
Infrared Camera | DY | $408.70 |
Thermo Hygrometer | DY | $19.80 |
Moisture Meter (Tramex, Protimeter) | DY | $19.80 |
Boroscope | DY | $49.03 |
Zip Poles (pair) | DY | $25.23 |
PPE – Standard Pkg (shirt or vest, hard hat, and gloves) | EA | $15.49 |
PPE – Add Gloves, Leather (pair) | EA | $6.69 |
PPE – Add Gloves, Nitrile (box) | BX | $38.14 |
PPE- Add Gloves, Cotton (pair) | EA | $3.25 |
PPE- Add Gloves, Rubber Coated (pair) | EA | $7.94 |
PPE – Add Ear Plugs (pair) | EA | $0.59 |
PPE- Add N-95 Dust Mask – Box of 20 | BX | $51.98 |
PPE- Add full Respirator | EA | $68.95 |
PPE- Add Fall protection | EA | $33.22 |
PPE – Add Confined Space Package | EA | $178.76 |
Respirator Cartridges P-100 (standard) | EA | $11.65 |
Respirator Cartridges P-100 (organic) | EA | $15.38 |
Coverall Suit w/Hood & Boot | EA | $15.46 |
Coverall Suit w/o Hood & Boot | EA | $5.82 |
Rubber Boots | PR | $46.91 |
Rain Suits | EA | $12.98 |
Knee Pads | DY | $4.11 |
Bottled Water | CS | $7.30 |
Microban (or Equal) | GL | $56.83 |
Fosters 40/20 | GL | $70.39 |
PRS Water Damage Preclean | GL | $59.93 |
Wall Wash | GL | $42.51 |
Soot Degreaser | GL | $50.15 |
Soot Encapsulant | GL | $41.17 |
Odor Counteracting Agent | GL | $36.98 |
Stainless Steel Cleaner | CN | $7.30 |
Odor Blocks | EA | $4.91 |
Vaportek Deodorization Cartridge | EA | $93.97 |
Bleach | GL | $4.90 |
Spray Adhesive | CN | $29.97 |
Glass Cleaners | GL | $7.38 |
Replacement Saw Blades | EA | $7.87 |
HEPA Vacuum – Filter | EA | $355.70 |
HEPA Vac-bags | EA | $5.22 |
HEPA Vac – Bonnets | EA | $5.49 |
Dehumidifier – Pleated Filter | EA | $11.91 |
Dehumidifier – Pre Filter | EA | $6.59 |
Air Scrubber – Hepa Filter | EA | $211.67 |
Air Scrubber – Pleasted Filter | EA | $13.19 |
Air Scrubber – Pre Filter | EA | $3.29 |
Vacuum Bags – Carpet Vac Bags | EA | |
Trash Bags | EA | $0.79 |
Paint Brush | EA | $11.43 |
Paint Roller | EA | $10.76 |
Paint Roller Pan | EA | $6.51 |
Blades – Remediation Saw | EA | $15.46 |
Rags – Cotton Cloth | lb | $5.18 |
Soot Sponge | EA | $4.15 |
Tarps | SF | $0.38 |
Barrier Fence | RO | $70.34 |
Sweeping Compounds | BX | $21.74 |
Spray Bottles/Triggers | EA | $5.38 |
Dusters | EA | $15.54 |
Containment Zipper | EA | $23.34 |
Lay – Flat Duct – 20″ | RL | $146.77 |
Lay – Flat Duct – 33″ | RL | $173.51 |
Painters Plastic – 1.5 mil 20’X100′ | RL | $38.89 |
Plastic Sheeting – 4 mil 20’X100′ | RL | $68.58 |
Plastic Sheeting – 6 mil 20’X100′ | RL | $90.57 |
Carpet Shield 24″x200′ | RL | $107.85 |
Sticky Mats – Pad of 30 tear-offs | BX | $33.02 |
Trash Bags – Heavy Duty 6 mil – 50 ct | BX | $78.01 |
Trash Bags – Light Duty 4 mil – 50 ct | BX | $66.21 |
Ram Board Floor Protection | RL | $94.74 |
Tape – Masking/Painters (or equal) | RL | $13.99 |
Tape – Duct (or Equal) | RL | $7.15 |
Tape – Barricade (or Equal) | RL | $15.53 |
Tape Gorilla (or Equal) | RL | $15.41 |
Tape – Box/Clear (or Equal) | RL | $3.38 |
Tape- Preservation (or Equal) | RL | $15.53 |
Tape -Foil | RL | $14.49 |
Bubble Wrap | RL | $63.33 |
Furniture Blanket | DY | $4.94 |
Box – Small w/Paper and Tape | EA | $4.95 |
Box – Medium w/Paper and Tape | EA | $6.07 |
Box – Wardrobe (or Similar) | EA | $33.26 |
Furniture Blocks | EA | $0.15 |
VinyiShield A 2 x 4 x 5/8″ Trim 64SF | CT | $54.96 |
Fire Secure Classic Stab Main Runner 12x 1-1/2 x 15/16′ | CT | $420.00 |
Fire Secure Classic Stab 4 x 1-1/2 x 15/16′ | CT | $420.00 |
Fire Secure Classic Stab 2 x 1-1/2 x 15/16′ | CT | $210.00 |
Wall Angle 12 x 7/8 x 7/8′ | CT | $600.00 |
CertainTeed 15/16″ x 12′ Main Runner tab | CT | $420.00 |
CertainTeed 15/16 x 4′ Cross Tee Classic Stab No. CS4-12-12 | CT | $420.00 |
CertainTeed 15/16 x 2′ Cross Tee Classic Stab No. CS2-12-12 | CT | $210.00 |
CertainTeed 12′ x 7/8 x 7/8 Wall Angle No. WA 14-14 | CT | $600.00 |
Symphony M NRC 75 2 x 2 x 3/4″ Trim 56SF | CT | $105.96 |
Symphony M NRC 75 2 x 2 x 3/4″Reveal 56SF | CT | $108.08 |
Symphony M RX NRC 70 2 x 2 x 3/4″ Trim 56SF | CT | $117.32 |
Fine Fissured High NRC 70 2 x 2 x 3/4″ Trim 56SF | CT | $63.67 |
Fine Fissured High NRC 70 2 x 4 x 3/4″ Trim 64SF | CT | $63.67 |
Fine Fissured High NRC 70 2 x 2 x 3/4″ Reveal 56SF | CT | $80.99 |
Fine Fissured High NRC 70 2 x 4 x 3/4″ Reveal 64SF | CT | $95.99 |
Fine Fissured High NRC 55 2 x 2 x 5/8″ Trim 64SF | CT | $73.59 |
Fine Fissured High NRC 55 2 x 4 x 5/8″ Trim 64SF | CT | $63.67 |
School Board NRC 55 2 x 4 x 5/8″ Trim 64SF | CT | $74.99 |
School Board NRC 55 2 x 2 x 5/8″ Trim 64SF | CT | $64.99 |
School Board NRC 55 2 x 2 x 5/8″ Trim 64SF | CT | $64.99 |
School Board NRC 55 2 x 4 x 5/8″ Trim 64SF | CT | $74.99 |
Serrano Fine Fissured NRC 75 2 x 2 x 3/4″ Trim 48SF | CT | $396.00 |
Serrano Fine Fissured NRC 75 2 x 4 x 3/4″ Trim 48SF | CT | $68.96 |
Serrano Fine Fissured NRC 70 2 x 2 x 3/4″ Reveal 48SF | CT | $78.96 |
Serrano Fine Fissured NRC 70 2 x 4 x 3/4″ Reveal 48SF | CT | $68.96 |
Serrano Fine Fissured NRC 75 2 x 2 x 3/4″ Narrow Reveal 48SF | CT | $68.96 |
Serrano Fine Fissured NRC 75 2 x 4 x 3/4 Narrow Reveal 48SF | CT | $78.96 |
Sand Micro NRC 50 2 x 2 x 5/8″ Trim 64SF | CT | $72.80 |
Sand Micro NRC 50 2 x 4 x 5/8″ Trim 64SF | CT | $79.56 |
Sand Micro NRC 50 2 x 2 x 5/8″ Reveal 64SF | CT | $72.80 |
Sand Micro NRC 50 2 X 4 X 5/8″ Reveal 64 SF | CT | $79.56 |
Sand Micro NRC 50 2 x 2 x 5/8″ Narrow Reveal 64SF | CT | $83.59 |
Sand Micro NRC 50 2 x 4 x 5/8″ Narrow Reveal 64SF | CT | $94.25 |
Materials/Consumables
Solutions Purchased Directly: |
In the event a solution is specifically purchased for the completion of the work and that item is not identified in the above list, the product purchased directly will be billed at cost plus a markup of 20%. The scheduled prices above shall be charged for all solutions utilized in the performance of the services provided, whether shipped directly, dropped shipped by a third party or locally purchased. The included list represents the more commonly used products. |
Materials Purchased Directly: |
In the event a Material/Supply is specifically purchased for the completion of the work, and that item is not identified in the above list, such material/supply purchased directly will be billed at cost plus a 20% markup. |
Subcontractor/Vendors
Subcontracted Labor: |
Subcontracted labor are those outside services provided within the scope of the project, and incurred by Renu Contracting Restoration in its execution of the project. Subcontracted labor will be scheduled based on the published labor classification and hourly rate listed, plus all other applicable billable items including, but not limited to; per diem, small tools, vehicles, lodging, etc. as published in this document and pertaining to this project. |
Specialty/Licensed Trades: |
Defined as, but not limited to; Electrical, Plumbing, Mechanical, and Specialty Trades, will be billed at presented invoice amount plus a 20% markup. |
Vendors: |
Defined as, but not limited to; supplier, vendor, or other entity providing supplies or materials, will be billed at presented invoice amount plus a 20% mark up. |
Reimbursable Items
Travel: |
Travel costs such as, but not limited to; airfare will be billed at presented invoice plus 20% markup. |
Vehicle Usage: |
All vehicles used at or for job performance will be itemized on the invoice and billed per day at the identified rate plus milage charge to cover fuel and other related expenses. In the event that a rental vehicles daily rate exceeds published “Job Vehicle” rate, Renu Contracting Restoration will bill at presented invoice amount plus a 20% markup. |
Permit and Related Fees: |
All Permits, bonding, and other related fees will be added to Invoice at the incurred cost plus a 20% markup. |
General
Taxes and Related Fees: |
The rates included in this schedule are exclusive of all federal, state, and local taxes. All taxes applicable to the work being performed will be billed as a separate line item of the invoice. If the client is tax-exempt, they must make Renu Contracting Restoration aware of this exemption and provide copies of all such supporting tax-exempt documentation. Any taxes incurred by Renu Contracting Restoration prior to such notification of a tax-exempt status, shall be reimbursed to Renu Contracting Restoration. |
Scheduled Rates: |
All scheduled rates are subject to change – any changes will be submitted to client in writing prior to change taking effect. The rates contained in this schedule are exclusive of all federal, state, and local taxes |